Connection Fees - Connection fees (also known as installation fees or connection charges) are one-time costs incurred when a property is connected to public infrastructure for the first time-specifically to the drinking water supply, wastewater disposal, and electricity, gas, and telecommunications networks. They are charged by the respective utility companies or the municipality.
Connection fees vary depending on the municipality, type of utility, and property size. In the Nuremberg metropolitan area, typical costs for a single-family home are as follows:
| Utility Type | Typical Costs (Nuremberg Metropolitan Area) |
|---|---|
| Water (connection fee) | 2,000 - 5,000 euros |
| Sewage/sewer | 3,000 - 8,000 euros |
| Electricity (grid connection) | 1,500 - 3,000 euros |
| Gas (if available) | 1,500 - 3,000 euros |
| Telecommunications/Fiber Optics | 500 - 1,500 euros |
| Total approx. | 10,000 - 20,000 euros |
These amounts are estimates - they can vary significantly depending on the distance to the nearest main line, soil conditions, and the scope of civil engineering work. If there is a long trench route from the property to the public utility line, the actual costs may be significantly higher.
For an existing building that is already connected, no new connection fees are usually charged-unless the connections need to be replaced or expanded (such as when increasing the power capacity of the electrical connection for a heat pump or photovoltaic system, re-laying the house connection during road renovation, or retrofitting fiber optics).
Connection fees must be distinguished from ongoing usage fees. The connection fee is a one-time payment for the construction of the infrastructure, while the ongoing usage fee is charged for actual consumption (cubic meters of water, kilowatt-hours of electricity). Both cost items must be taken into account in the overall calculation for a new building.
Connection fees for initial development are considered part of the acquisition costs of the property and are not immediately tax-deductible. For rental properties, they increase the depreciation base-but only to the extent that they are attributable to the building and not to the land. Connection fees for the renewal of existing connections may be deductible as maintenance expenses and thus as income-related expenses when the property is rented out.
| Cost Type | Nature | Due Date | Tax Treatment |
|---|---|---|---|
| Water connection fee | One-time, public law | Upon connection | Land acquisition costs |
| Sewer connection fee | One-time, public law | Upon connection | Land acquisition costs |
| House connection for electricity (grid connection) | One-time, private law | Upon connection | Construction costs of the building (depreciation) |
| House connection for gas | One-time, private law | Upon connection | Construction costs of the building (depreciation) |
| Fiber-optic house connection | One-time, private law | Upon connection | Construction costs (depreciation) |
| Drinking water fee | Recurring, consumption-based | Monthly/annual | Operating costs / Tax-deductible expenses |
| Sewage fee (wastewater) | Recurring, consumption-based | Monthly/annual | Operating costs / Tax-deductible expenses |
| Basic electricity fee | Recurring, usage-based | Monthly | Operating costs / Tax-deductible expenses |
For new construction lots in development areas, total connection fees can range from 15,000 to 25,000 euros-depending on the location of the main lines and civil engineering costs. These costs must be fully incorporated into the construction cost planning and are financed by banks as part of the overall project.
In some municipalities and through KfW Bank, there are funding programs for specific connections-in particular for:
These funding opportunities should be explored before planning begins, as applications often must be submitted before construction starts.
We recommend inquiring about connection fees early on with the relevant utilities and the municipality and including them in the overall cost calculation for the construction project. In Nuremberg, Stadtwerke N-Ergie (electricity, gas), NüWa (water), and Stadtentwässerung Nürnberg are the main points of contact. These costs are often underestimated and can significantly increase financing requirements. Timing is also important: Connection requests should be submitted well in advance, as processing times can take several weeks.
For new construction, the builder (usually the buyer) pays the connection fees-they are part of the total construction costs. For existing properties, the connections are usually already in place and were paid for by the previous owner during the original construction. The purchase agreement should specify whether any outstanding or overdue development fees are to be borne by the seller or the buyer-hidden costs can lurk here.
Yes, the connection fees can be financed through the construction loan, provided they are included in the total cost breakdown. The bank considers them part of the construction or incidental purchase costs. Important: The costs must be documented-through official notices or binding offers from the utility providers.
For water and sewage, there is generally a mandatory connection and usage requirement under municipal regulations. Electricity is effectively indispensable, even if self-supply via PV is theoretically possible. Gas and telecommunications are optional-those who heat with a heat pump and forgo gas heating save on the gas connection fee. Fiber optics are increasingly considered standard for new construction in Bavaria, but are not formally mandatory.
Properties in rural areas (pursuant to Section 35 of the German Building Code) or in scattered settlements outside of development zones often lack a complete public utility infrastructure. Developing these properties with sewer and water connections can incur significant costs if pipes must be laid over long distances. In such cases, development costs can quickly reach five figures-in some instances, the costs are so high that a decentralized solution (small-scale sewage treatment plant, rainwater harvesting) makes more economic sense. In the rural communities around Nuremberg-such as in the Nürnberger Land district or the Neumarkt i.d.OPf. district-builders and buyers should clarify before purchasing a property whether all necessary connections are already in place or secured through public development measures. Although undeveloped properties are offered at lower prices, the development costs can make them significantly more expensive than a property that is already developed, even if the purchase price is higher.
Back to the Real Estate Glossary.
Want to know your property's value?
Get a market valuation in 2 minutes - free and non-binding.
Important Disclaimer
The information, assessments, and legal notes in this real estate glossary serve solely as general orientation. Despite careful preparation, we assume no liability for the accuracy, completeness, or timeliness of the content. These contents do not replace individual legal or tax advice. We strongly recommend consulting a qualified attorney or tax advisor for specific matters.
Get a free, non-binding valuation - in person or online.
We're where your property is - across the entire metropolitan region
To guarantee maximum speed in valuation and marketing, we have fully digitized our processes. We advise you exclusively and personally by phone or video call. On-site appointments at your property of course still take place in person. Visits to our headquarters in Weißenburger Str. by prior appointment only.
Talk directly with an expert.
Call - 0911 / 88 18 73 80Send us your inquiry via WhatsApp.
WhatsApp messageWe'll get back to you within 24 hours.